A complete structural building upgrade and expansion, coupled with a beachy modern Curated design aesthetic.
The original bungalow style venue has received a major infrastructure upgrade with all services to tie into various council mains with the addition and extension of the venue to now include an indoor-outdoor pavilion on the tranquil river front with the inclusion of a new intimate covered courtyard.
Interiors masterfully designed by the renowned hospitality designer LK required the removal of the upper half of the roof structure and the installation of rustic feature trusses not over 3m centres.
All works completed without removing or replacing the existing roof or roof sheets .
Comprising of approx. $1.5-$2m worth of in ground services and standard requirements. No expense was spared to ensure a venue and destination that will impress thus ensuring the return of tourists of locals time and time again.
Key Challenges:
— Safe removal of structural steel beams using crane support
— Precision cutting and demolition within an occupied structure
— Sequential concrete formwork construction for the three-sided lift shaft
— Integration of the glass façade into the new elevator structure
— Structural integrity considerations during demolition and new construction
— Logistics and site access for heavy machinery in a confined work area
— Bathroom refurbishment coordination with existing plumbing and services
— Delivering a cold shell fit-out for future tenant flexibility