Harvey Norman

Building Guild was engaged by Harvey Norman to construct a warehouse facility in partnership with Leffler Simes Architects.

With a four-month project timeline, the scope of works required a full demolition of the existing warehouse, involving removal and disposal of the warehouse, roof, ground floor amenities and first floor office.

During the development phase of the project, construction consisted of several elements. This led to Building Guild delivering and project managing concrete works, as well as partitioning, joinery and structural steel installation, the use of metalwork for handrails and access ramps, roofing, masonry, concrete grinding, render make-good, and window make-good.

Cosmetic works were also included after the initial construction of the warehouse. This consisted of internal floor preparation, painting, carpet installation, tiling, and instalment of new garage doors including track, motor and guides.

  • Sector Industrial

  • Design Partner Leffler Simes Architects

  • Location Auburn, NSW

  • Programme 4 months

Related projects

Sir Joseph Banks Industrial Estate Botany, NSW

View

Daimler Fuso Huntingwood Warehouse Huntingwood, NSW

View

Regents Park Regents Park, NSW

View

For all new enquiries, or if you would like to learn more about us, get in touch, we’d love to talk with you

For all new enquiries, or if you would like to learn more about us, get in touch, we’d love to talk with you

Head Office 33a Morley Avenue,
Rosebery, NSW 2018

Contact (02) 9697 9946 info@buildingguild.com