Asset Repositioning

Building Guild was engaged to undertake a comprehensive refurbishment at 85 Epping Road, North Ryde. Transforming the three-storey building with the additions of major structural modifications and facility upgrades.

A key element of the project involved the demolishing of the façade and structural sections of the building to make way for a new passenger lift. This required carefully planned crane operations to support and remove large structural steel beams while ensuring the integrity of the surrounding structure. The new lift shaft was constructed using in-situ off form concrete on three sides, while the fourth side featured a striking new glass façade, allowing natural light to flood the lift area and lift shaft thus enhancing the building’s exterior aesthetic.

Beyond the structural modifications, the refurbishment included upgrading all existing bathrooms to enhance functionality and aesthetics. The upper three floors were delivered as a cold shell, providing flexibility for future tenants to customize the space to their needs.

Through meticulous planning, technical expertise, and strategic execution, Building Guild successfully delivered a high-quality refurbishment, balancing complex structural challenges with minimal disruption to the building’s ongoing operations.

Key Challenges:
— Safe removal of structural steel beams
— Precision cutting and demolition within an occupied structure
— Sequential concrete off formconstruction for the three-sided lift shaft with a 10mm tolerance over 3 floors
— Integration of the glass façade into the existing & new structure, new elevator & beyond
— Structural integrity considerations during demolition and adding new into old
— Logistics and site access for heavy machinery in a confined work area
— Mechanical upgrades

Work involved:
— Scaffolding
— Façade Cladding
— Façade Glazing
— Waterproofing
— Needle / Propping
— Structural Steel
— Concrete
— Cranage / Road closures
— Roofing
— New Lift
— Live Environment
— Underpinning
— Excavation for lift

  • Sector Commercial

  • Client Novo Real Estate

  • Project Size Complete Building

  • Programme 18 weeks

Related projects

Carnival Chatswood, NSW

View

Schroders Investments Sydney, NSW

View

66 Goulburn Street Sydney – Level 19 Sydney, NSW

View

For all new enquiries, or if you would like to learn more about us, get in touch, we’d love to talk with you

For all new enquiries, or if you would like to learn more about us, get in touch, we’d love to talk with you

Head Office 33a Morley Avenue,
Rosebery, NSW 2018

Contact (02) 9697 9946 info@buildingguild.com